Pageloader

Portfolio

Our previous works
School Dance Studio and Classrooms

School Dance Studio and Classrooms

We were luckily enough to win the...

Full Office Refurbishment

Full Office Refurbishment

...

ISCA Medical Centre

ISCA Medical Centre

This was the conversion of an old house into a doctors surgery, Diamond designed, installed...

Pre-School Toilet

Pre-School Toilet

These works were completed in September 2016 and to a high quality standard....

Beacon School

Beacon School

A conversion of a storeroom into an accessible WC was completed on time and on...

Garden Watering System

Garden Watering System

Installation of a garden watering system utilising an AC drive to control a pump which...

Oil Tank for Pub Kitchen

Oil Tank for Pub Kitchen

We replaced an oil tank for a pub kitchen, the new tank was positioned in...

Pub Sign Board

Pub Sign Board

A pub sign was blown lose by high winds, we attended and removed the sign....

Classroom and Teaching Area Extension

Classroom and Teaching Area Extension

An extension to a school building which commenced during the school holidays and into the...